Files
Download
Download Full Text (34.1 MB)
Description
Last fall, Dover Theater was under inspection when Gardner-Webb noticed the theater was experiencing structural problems. Since then, there has had to be changes in events and productions that were scheduled. With everything going on with the building, there is a need for clarification regarding the theater.
Publication Date
2-2-2015
Publisher
Gardner-Webb Univeristy
City
Boiling Springs, NC
Keywords
news
Recommended Citation
Laws, Ellen, "Inspection Improvements Lead to Dover Shutdown (2015). GWU-Today. 118.